Ultralift
Say Goodbye to Manual Cranking Trailer Landing Gear




Care about your
drivers. See For Yourself.
Effortlessly raise and lower your trailer landing gear without the hassle of manual cranking.
Guaranteed Performance on Any Trailer, Loaded or Unloaded! The Stabilizer Bracket installs in just 5 to 10 minutes with a simple 4-bolt system. Even with a low battery, the manual crank stays attached, so you're never stranded. The Ultralift Power Tool transforms manual cranking into an efficient backup, boosting convenience and operational efficiency.
VALUE add+
Understanding Baseline Wages: Analyzing ROI Impacts of the Ultralift Advantage
Min High Carrier Rate/Hour for Class A
- Truck and Driver Annual Wage
- Total Op Cost = $80/hr.
- 2,080 hours = 8 hours/day + 2% overtime for 255 days, averaging 21.25 days/month = $165K+
Min High Carrier Rate/Hour for Class A
- Truck and Driver Annual Wage
- Total Op Cost = $80/hr.
- 2,080 hours = 8 hours/day + 2% overtime for 255 days, averaging 21.25 days/month = $165K+
$240.00/Month
Cost reduction in 21 Days
262.5 Min
Time Saved in 21 Days
Ultralift ROI
Summary
By reducing the time spent at each stop from 5 minutes to 2.5 minutes across 5 stops daily, we can save a total of 12.5 minutes each day with the Ultralift system. Over a 21-day period, this amounts to 262.5 minutes, or approximately 4.36 hours, leading to a cost reduction of $240.00 per month. Additionally, when factoring in the cost of leased trailers, which is approximately $25 per month at MSRP (based on a $20 payment for every $1,000 financed), the investment remains justifiable.
Even if a driver completes only one stop per day, this results in about 1 hour of savings—a return on investment (ROI) more than double the monthly leasing cost. This demonstrates a sensible and financially beneficial decision.
To provide an alternative viewpoint, a driver would need to complete approximately ten unloading and reloading tasks each month for the Ultralift to justify its cost.
Problem
and
Solution
Problem
Manually raising and lowering your trailer landing gear increases the potential for back, shoulder and other bodily injuries even when performing the repetitive motion correctly on a daily basis.
Solution
Our Stabilizer Bracket is a quick 5-10 min install using a 4 bolt assembly system. In the event of low battery, the manual crank stays on your trailer at all times, never leaving you stranded.Ultralift powertool replaces and turns your current manual cranking procedure into a secondary backup solution.


Dan Barney
Manager, Logistics
I highly recommend the Ultra Lift for any logistics operation. It solved a critical ergonomic issue by eliminating the repetitive motion strain of manually dropping and switching trailers. This equipment makes raising and lowering trailers effortless, significantly reducing the risk of injury for my team.
It also streamlines trailer exchanges, boosting overall fleet efficiency. The Ultra Lift boasts impressive battery life, is simple to install, and the support from the Ultra Lift team has been phenomenal. A game-changer for our operations!